Add-Ons

Production

Lodging & Overnight Parking

City

400 / Day / 2 Staff

Contents

Urban

300 / Day / 2 Staff

Contents

Rural

200 / Day / 2 Staff

Contents
Protection & Cleaning

Indoor Protection & Cleaning​

  • 36x35ft Area (3 grips) 130 Max Capacity​

  • With Ambassadors Email Us
  • Full Service Email Us
  • 48x35ft Area (4 grips) 190 Max Capacity

  • With Ambassadors Email Us
  • Full Service Email Us
  • 60x35ft Area (5 grips) 250 Max Capacity

  • With Ambassadors Email Us
  • Full Service Email Us
  • 72x35ft Area (6 grips) 310 Max Capacity

  • With Ambassadors Email Us
  • Full Service Email Us
  • 72x47ft Area (8 grips) 410 Max Capacity

  • With Ambassadors Email Us
  • Full Service Email Us
  • 84x47ft Area (10 grips) 490 Max Capacity

  • With Ambassadors Email Us
  • Full Service Email Us
  • 84x70ft Area (14 grips) 740 Max Capacity

  • With Ambassadors Email Us
  • Full Service Email Us
  • 96x70ft Area (16 grips) 860 Max Capacity

  • With Ambassadors Email Us
  • Full Service Email Us

Outdoor Cleaning

Spraying & Squeegeeing

2 /SQFT

Contents
LED VIDEO WALL & Visuals

Motion Graphic Visuals on a large LED Video Wall!

24ft LED Video Wall

16,995

Contents

12ft LED Video Wall

4,995

Contents

6ft LED Video Wall

1,495

Contents
High-Powered Laser Show

Tier 3

6,700 4,990

Tier 2

4,700 3,490

Tier 1

2,700 1,990

Power

Tier 2
A Common Level 4+ Requirement Satisfier

Email Us

Tier 1
A Common Level 1-3 Requirement Satisfier

1,995 1,495

Staging & Stage Table

Tier 2

2,000 1,500
then 50% per additional day, or set & strike

About

Tier 1

1,150 850
then 50% per additional day, or set & strike

About
Ceiling / Roof Solutions

Tier 3
A Common Level 5+ Requirement Satisfier

11,400 8,495

This is a major stage protectant, allowing the event to continue if it is raining. However, with the limited space that the ceiling protects, it may not protect all services – those will be covered, struck, or not set up. 

Tier 2
A Common Level 3-4 Requirement Satisfier

8,000 5,995

This is a major stage protectant, allowing the event to continue if it is raining. However, with the limited space that the ceiling protects, it may not protect all services – those will be covered, struck, or not set up. 

Tier 1
A Common Level 1-3 Requirement Satisfier

600 445

This protects the DJ & Front Of House / Control Booth from possible light rain but does not protect stage lighting or sound; therefore, most lighting and sound may be covered, stopped and struck, or not set up if light rain is imminent. This does not protect the event if rain or heavy rain is imminent. See our weather procedures for more detail. 

Cable Guard Solutions

3' Cable Guard

200 150 / 2.7ft

45 Degree Right or Left Turn

11,400 200

Barriers

Mojo Barriers

Email For Price

Rack Barriers

Email For Price